|
|
||
| Design & Estimation | Construction | Basement | Home Theater | Kitchen | Bathroom | |
http://www.bathroom-kitchen-remodeler.com
|
How do we work?Step 1. Fill-out the E-Form for get in-home consultation and estimate. During this first email-consultation, we will set up an appointment to meet at your project site. http://www.sokoldesigngroup.com/get_estimate.htm.
Step 2. Discussion and Consultation of Project Design on-site: Our first priority is to listen to your needs and to gain the feel for how you want your project to function and look, and to discuss feasibility of design and your budget. Your budget-range will be our target for our design.
Step 3. Conceptual Design Agreement and Preliminary Cost Estimates: We will provide three different 3D computer models of design with corresponding preliminary estimates for each of version (see example). The cost of the Conceptual Design Agreement is $ 550 - $1,500 (depending on size of the project), and design will be ready in 5 working days from receipt date of the agreement signed. The Conceptual Design will help you to clearly see our project ideas with your budget range, and how you can influence the outcome of your project. If you decide to proceed with the project with us, this money is credited back to you as a deposit on the construction project.
Step 4. Fixed Price Contract and Construction: After signed the Fixed Price Contract (see example), we will get the building, plumbing and electrical permits and begin construction process. In the building/remodeling process, our Project Manager is responsible for scheduling the trades and products necessary for project completion along with high quality assurance. Our team is supervised and meets on the job site every day, providing 24 hours emergency on call, and is in constant communication with the company owner.
Step 5. After finish the project. We provide a 1-year warranty on all finishing of work, and a 10-year warranty on all structural work performed.
Frequently Asked Questions: Converting Basement to Rental Unit Project
Which steps will I need to convert a basement into a rental unit? : 1. Check that the District of Columbia conforms to the Zoning Regulations of DCRA for the opportunity to doing of rental unit. 2. Design and get Building permit for convert your basement (according DCRA's requirements). 3. Construction the rental unit with all necessary inspection (building, plumbing, electrical). 4. Get the DC Certificate of Occupation: http://dcra.dc.gov/service/get-certificate-occupancy 5. Get a DC Business License for rental location: Landlords' Responsibilities, Rent, and Security Deposits: http://www.lawhelp.org/dc/resource/landlords-responsibilities-rent-and-security?ref=uFZYm
This is the most important issue for majority of customers when discussing their future project. The cost of converting the basement depends on several factors, and is usually equal to the value of future lease for 3-4 years. i.e., your investment will pay off in 3-4 years. The average costs of the one bedroom apartment unit will 65K - 95K
How long convert process will for basement finish? It’s depends on the specifics of your basement, but as a rough estimate, a remodeling process will take 2-4 months.
|
This site was last updated 02/11/2014
|
Local Remodeler | Zillow.com| Yahoo Local | Local Kitchen & Bath Remodeler | Local Design-Build and Remodeling Company |Rockville Remodeler|Yellow Page.com | Germontown Remodeler | Basement Convert | My Facebook | My Twitter | Best Remodeler | Google Music iPhone App | Sokolware Technical Consulting | Furniture Rent & Sale
© Copyright - 2013, SOKOL DESIGN-BUILD GROUP LLC. All Rights Reserved
Washington, DC - 202-596-7324 Maryland - 240-364-4254
E-Mail: [email protected]
|